Dubai Electricity & Water Authority (DEWA) will be checking Advanced Metering Infrastructure / devices in the main LV Rooms of Fortune Executive Tower.
This will result in interruption in electricity supply in each Unit for approximately 15 minutes. Exact time for each floor can be confirmed at the Reception
Maintenance Schedule:
Floor | Planned Shutdown Date | Planned Shutdown Time |
Floors 1 to 15 | October 22, 2016 | Between 8.30 to 17.30 |
Floors 17 to 35 | October 29, 2016 | Between 8.30 to 10.00 |
Leave A Comment
You must be logged in to post a comment.